Best Energy
180 and 160 ha
Establishment of Two Interconnected Solar Parks in Vejen Municipality.
Establishment of Two Solar Parks in Holsted and Glejbjerg, Located in the Northwest of Vejen Municipality
Covering a total area of 180 and 160 hectares respectively, the solar parks are interconnected and supply power directly to the 150kV grid at Holsted, supporting the region's renewable energy needs.
We have played a crucial role in the development of these projects, including assistance with land acquisition, consolidation, surveying, and boundary setting, as well as handling landowner negotiations along the transmission route on behalf of the project developer Best Energy. After the sale of the parks to European Energy, we continued to support the project by assisting with the technical execution of the grid connection.
The construction of the solar parks is scheduled for 2023-2024, and we are proud to have contributed to a project that significantly enhances sustainable energy production in the region.